Clearing the areas of furniture all areas that will be sanded should be clear of furniture and anything that may easily collect dust e g.
Preparing house for floor sanding.
Furniture will have to be moved from room to room or out of the house entirely.
There are few things to bear in mind when preparing for wood floor restoration which you might want to sort just before it s time for the works to begin.
Multiply length times width of the room.
Situations differ but you may not be able to refinish your hardwood floor more than 10 times.
Reasons to leave include.
Seal off rooms that will not be sanded.
Just sand any high spots and fill the low spots with leveling compound.
Add about 10 to that number to account for any possible mistakes and warped boards.
Remove any carpet or other flooring.
Arrange the plywood on the floor so the joints of this layer do not align with the subfloor joints below.
With time and due to a number of factors mainly due to high traffic heavy footfall everyday use etc.
Start sanding the floor with some really coarse sandpaper we started with 24 grit paper.
If i ve removed all of the dirt and grime with the coarse paper why do i have to bother sanding it again with finer paper.
You ll need to know how to level a floor.
Worn finish the main idea of floor sanding is stripping off the top layer of your floor that is mainly a floor finish.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
But you may want to supplement their dust control efforts.
If your wood floor refinishing or installation job is extensive and you want it done in one job it might be best to stay elsewhere until the project s done.
Most wood floor installers will take basic preparations to contain the dust.
After removing most of the old layers of varnish stain and grime you can move on the less coarse paper.
Allow 1 4 inch gap along the walls and between the joints for expansion.
Thoroughly vacuum the existing floor and use a long floor leveler and tape measure to ensure the subfloor is level within 3 16 inch for every 10 feet.
Determine how much flooring and materials will be needed.
And the finish will start experience wear and tear to the point where if you neglect it for longer you can start.