D925 unres lwc z106hy.
Podium slab floor ceiling assembly.
Floor ceiling assemblies with composite deck.
Deck finish shall be galvanized 2.
Here you can find drawings for our ul fire rated floor assemblies and ul fire rated ceiling assemblies.
D925 unres lwc mk6gf.
It will be a 5 store building with the first floor constructed using metal stud framing steel column and beam structure with a hollow core concrete slab floor ceiling assembly with 4 stories wood framing structure above this podium.
N708 unres all.
D925 unres lwc all.
Refer to the u l.
In multifamily residential structures a concrete podium slab typically acts as both a structural floor and as a transfer slab for wood and light gauge steel framed construction above.
Usually these slabs are situated above parking levels and as such require higher fire ratings and reduced sound transmission.
Concrete thickness is thickness of slab above deck in.
D925 unres nwc z106hy.
Fire resistance directory for the necessary construction details.
The issue is that the lobby and pool room are outside of the 5 story footprint.
D925 unres nwc all.
Na beam unprotected floor substitution cellular.
Podium slabs are special type of floor system that transfers loads from a steel or wood frame structure above the slab to walls and columns below.
Na lwc fluted cellular ul d925.
Unprotected future floor ceiling nwc fluted cellular ul d925.