There are two primary methods used for removing a scored concrete floor a jackhammer and or a sledgehammer.
Plumbing in concrete floors.
Also notice the drain is centered right in the middle of this 30 inch vanity.
At this point you will no longer see the horizontal drainpipes and the main sewer line but you will see the stubs that extend vertically out of the sand.
The two major plumbing codes in the united states is the ipc international plumbing code and the upc.
When a house is to have a poured concrete slab first floor all the pipes and fittings below the floor level must be put in place before the floor is poured.
It can also run under sidewalks stoops patios and decks.
Reasons why you should hire concrete floor installers.
Plumbing is one of the rough in elements of construction and is generally hidden by the finished elements such as walls floors and roofs.
Once you have finished scoring all the concrete that lies in the path where the plumbing will be installed it s time to get the concrete out.
To book free estimate call.
The plumbing trenches are typically dug at the same time as the slab footings if any.
The center of the lav s drain is located 18 approximately above the finished floor.
The top openings should be packed with something to prevent concrete or debris from falling into the line.
Once the trenches are dug you can add the sewer pipes and stub outs pipes that sit above the slab floor that eventually connect the sink toilet bathtub or shower and any other drains to the system.
Plumbing drain design for concrete slab houses.
Here with this video you will learn some of the basic rules of thumb for doing rough in plumbing underground.
Removing concrete for plumbing.
647 784 8448 or email.
Considerations cutting through a concrete floor should be a last resort.