I made this list as a way to contribute to those who may be fatigued by the same recycled horror we ve been plagued with for so long.
Plastic over second floor horror sealed.
Cure floor with linseed oil process as per the previous method.
If the slab is going to get a finish floor over it then there are no worries since it won t be seen.
All seams should be taped with a compatible tape and the perimeter should be sealed with canned spray foam or high quality tape.
A concrete floor seems like the perfect base for a vinyl floor installation.
For installation of vinyl flooring you need a smooth even surface for the underside of the flooring to achieve the best contact for adhesion.
Butyl tape is applied to seal all seams.
If you live in a house with an extra guest room basement or surplus bathrooms that don t get a lot of use then frugal living blog the simple dollar recommends you seal those rooms off to help.
To avoid this leaking problem you must install an under deck system.
A concrete floor with a too high moisture content can wreak havoc on a vinyl floor.
The downspouts can be oriented to fit between joists spaced 12 or 16 inches on center.
The usual way to separate a damp crawl space from a wood framed floor assembly is to install a continuous layer of foil faced polyisocyanurate on the underside of the floor joists.
For 3 1 2 slab a 6x6 w4 0xw4 0 will do.
Systems are available in a variety of materials so that you can match it to your deck and home s style.
One option for a floor air vapor barrier is a polyethylene plastic sheet placed over the floor joists and sealed to the wall vapor barrier.
So there you go there are many other ways to build a long wearing earthen floor other than these two methods but that s a start.
Minimum recommended reinforcing per aci is 0 18.
For a 5 thick slab a 6x6 w5 5xw5 5 mesh will serve.
Slab on grade done wrong note the layer of granular material over the top of the plastic vapor barrier.
Liquid phase water will be held by the fines in the granular material creating a reservoir of water that can only dry upwards into the slab leading to problems with floor finishes and floor coverings.
A second story deck that is made of wood flooring includes gaps between planks and around the perimeter of the deck.
Each of the layers in this method needs to be completely dry before starting the next layer.
Placing a basement vapor barrier over exposed bottoms of overhead floor joists forming the basement ceiling.
The trex rainescape membrane which comes in rolls is fastened loosely to the top edge of deck joists.
Water seeps through these gaps onto the level below.
I never spec slabs less than 5 on my projects.